Construction
Representative Cases
- Dispute involved the claims of a multinational construction management firm for delay and scope changes resulting from differing site conditions related to the construction of a portion of the Westside extension of the Los Angeles subway system.
- Matter involved claims for delay, defects, and nonpayment on a $2 billion-plus mixed-use project in Downtown Los Angeles.
- Matter related to claims for delay, scope changes, and defective work in the replacement of an iconic bridge in Downtown Los Angeles.
- Dispute involved a multinational design and engineering firm with claims related to the failure of a bulkhead wall that formed a new harbor in the Port of Los Angeles.
- Case involved claims of a multinational design and engineering firm for delay and inefficiency damages related to a defective design of a freeway interchange.
- Matter involved a multinational owner prosecuting counterclaims against a contractor for scope changes and delay damages related to construction of a pea protein isolate processing plant located in South Sioux City, NE.
- Matter involved a multinational design and engineering contractor in a dispute over the delay of completion of two border patrol and police headquarters buildings in Nimruz Province, Afghanistan.
- Action involved a construction management firm with claims for delays, equitable adjustment, and disgorgement related to license violations in the design-build of the San Francisco County Jail No. 3.
- Matter involved a multinational construction management firm in an action brought by a subcontractor relating to curtain wall construction on a multistory parking garage.
- Action related to the prosecution of claims by a construction management firm for reimbursement for defense costs of asbestosis/mesothelioma claims related to jobsites in several states during a 60-year period.
- Case involved a claim by an HOA against a developer for construction defects in a 161-unit condominium complex.
- Dispute related to a religious institution’s prosecution of claims to recover for delay, loss of use, and defective construction for a West Los Angeles sacred space/school.
- Matter involved the owner-developer’s claim for defects and loss of use related to construction of a Florida retirement community.
- Dispute between the owner of a single-family estate property and a contractor for delay, loss of use, and defective construction.
- Action involved a multinational general contractor’s claim against a design firm for negligent design in the design and construction of a retirement home/senior care facility.
- Matter involved claims of a developer/bank owner for delay, loss of use, and defective construction of a hotel development in Shell Beach, CA.
- Matter by subcontractor that built the canals at the Venetian Casino in Las Vegas in against owner to recover payment for work performed.
- Matter involved claims by a general contractor for recovery on a mechanic’s lien for a resort project on the Nevada–California border.
- Action related to a multinational general contractor’s claims of delay, loss of use, and defective construction for the construction of the Simi Valley Hospital.
- Dispute related to a developer’s claims against a contractor and subcontractors involving mold and fungus growth from a defective exterior insulation and finishing system (EIFS) in a multi-hundred-unit apartment complex.
- Case involved claims by owners of a Sun Valley, ID, private residential compound for defective design and construction of four private residences on site.
- Dispute related to claims against a general contractor for delay, loss of use, and defective construction for the replacement of the basketball floor of the Haas Pavilion at UC Berkeley.
- Case involved claims of defective construction related to the construction of the ARTS building at UC Riverside.
- Matter involved claims against a general contractor for delay and loss of use relating to the construction of a dormitory at UC San Diego.
- Dispute involved an engineering firm and the Los Angeles Department of Water and Power related to claims of negligence against the designer and contractor of a water treatment plant in Los Angeles.
- Handled a claim against homeowner by his architect for fees related to a single-family home remodel.
- Handled dozens of actions involving foreclosure on mechanic’s liens and prompt payment remedies for large painting subcontractor.
- Handled matter brought by the Nevada Department of Transportation against a designer for defective design of embankments along highway in Las Vegas.
- Dispute brought by joint venture against a joint venturer for non-payment of capital call related to construction of interstate through downtown Orlando, FL.